Gold Mining Technical Improvement Project of Rongda Mining Corp. in Sichuan

Daily operation: 16 hours; Material: gold ore; Final product size: <12mm

The original gold crushing production line used C100+GP11F two stage – closed-circuit crushing process with final product size less than 18mm; according to production requirements, it needed to expand the scale and reduced the grinding size. So three stage – closed-circuit process was taken and our company’s single cylinder hydraulic cone crusher HST160 and multi cylinder hydraulic cone crusher HPT300 were arranged to form the crushing line C100+HST160 (S2) +GP11F, HPT300. The new processing technology makes output size reach less than 12 mm, which attains the capacity of processing a great deal of qualified materials and the ideal product size before grinding. After a long time of production and operation, production capacity significantly exceeds the original design expectations.

Customer Feedback

Because the local climate condition is very bad, our requirements are very high. We got to know SBM by a friend’s strong recommendation and found there are a lot of successful cases of SBM’s machines used in the harsh environment of the plateau. SBM team was professional and efficient in the cooperation. Machines have a strong adaptability to harsh environment and high capacity. The cooperation with SBM is pleasant.

Get Solution & Price Right Now!

We sincerely welcome you to contact us through hotlines and other instant communication ways.